Thorley Lane Car Park

We were appointed by Manchester Airports Group (MAG) to deliver the design and construction of two new car parks at Thorley Lane, supporting increased parking capacity ahead of the busy summer travel season at Manchester Airport.

The scheme was completed within an accelerated five-month programme, ensuring the facilities were operational in time to meet the client’s seasonal demand. The project involved the complete transformation of the sites, including resurfacing works, parking infrastructure, lighting, security systems, drainage, telecommunications and associated civil engineering works.

  • Location Thorley Lane Car Parks A & B, Manchester Airport
  • Completion Date May, 2026
  • Services Provided Surveys, Design, Civil Engineering, Surfacing, Lighting, Security Systems, Electrical Infrastructure, Telecommunications, Data Networks, Drainage & Access Control Systems
  • Project Duration 5 Months

The Challenge

With a fixed deadline driven by operational requirements and anticipated summer passenger volumes, the project demanded a carefully coordinated approach from the outset.

R&M were required to undertake site surveys, develop a compliant design solution, procure specialist materials and subcontractors, and complete all construction activities within a condensed timeframe. The design also needed to align with MAG’s asset standards and operational requirements while ensuring the car parks could be delivered efficiently and safely.

Close collaboration between design, commercial and delivery teams was essential to maintain programme certainty and meet the client’s expectations.

Thornley Car Park Before Works

The Solution

Acting as both Principal Designer and Principal Contractor, R&M developed a comprehensive design solution that balanced programme requirements, operational functionality and long-term asset performance.

The scope of works included:

  • Detailed site surveys and design development
  • Construction of two new car park facilities
  • Car park resurfacing works
  • Installation of designated parking bays and lane markings
  • New LED lighting infrastructure
  • Security camera installation
  • Entry and exit barrier systems
  • Electrical infrastructure installations
  • Telecommunications and data network installations
  • Surface water drainage works
  • Associated civil engineering and infrastructure works

By integrating the design and construction phases, R&M were able to streamline decision-making, reduce programme risks and maintain progress throughout the project lifecycle.

thornley car park

The Results

The completed Thorley Lane Car Parks A & B provide Manchester Airports Group with modern, fully operational parking facilities designed to support increased passenger demand and enhance the overall airport parking experience.

Despite the challenging programme, R&M successfully managed the project from concept through to completion, delivering a high-quality solution that met the client’s operational requirements, asset standards and critical seasonal deadline.

The successful delivery demonstrates R&M’s capability to provide turnkey Design & Build solutions for complex infrastructure and civil engineering projects, combining technical expertise, programme management and on-site delivery within demanding environments.

  • Go to the Previous SlideGo to the Next Slide
  • Go to the Previous SlideGo to the Next Slide
  • Go to the Previous SlideGo to the Next Slide
  • Go to the Previous SlideGo to the Next Slide
  • ISO 9001
  • ISO 45001 R&M Developments
  • ISO 14001 R&M Developments
  • UKAS R&M
  • chas r&m development logo
  • construction line logo